The Emerald Energy from Waste facility has been operating in Peel since 1992, initially built and operated by Algonquin Power. The Region cancelled a waste burning contract with Algonquin in 2012 but the facility was sold to Emerald shortly thereafter and has been continuing operations by consuming waste from industrial, commercial and institutional sources.
|
In 2016, the Region considered building its own waste burning facility but cancelled those plans due to concerns about the pollution a second facility would emit. Instead it embarked on a plan to divert 75% of its waste by 2034, through a combination of improved policies, procedures and, technologies related to waste reduction, reuse, recycling and, composting.
|
|