Heat Pump Chronicles Vol 8.

This is the eighth in a series of posts on our journey to navigate government grants and loans available for home energy retrofits and to replace our natural gas furnace with a cold-climate heat pump. Click here to see all articles in the series .

I want to share our first experience with our heat pump now working as an air conditioner. In a word, FANTASTIC!

Once the weather gets consistently milder my habit has been to turn off the furnace and open the windows to bring in some fresh air. This year we were able to do that in early May. I have typically only turned the A/C on when we experience hot weather over multiple days.

Continue reading “Heat Pump Chronicles Vol 8.”

BEA delegates to Peel Regional Council

Regional Council

The Emerald Energy from Waste facility has been operating in Peel since 1992, initially built and operated by Algonquin Power. The Region cancelled a waste burning contract with Algonquin in 2012 but the facility was sold to Emerald shortly thereafter and has been continuing operations by consuming waste from industrial, commercial and institutional sources.

In 2016, the Region considered building its own waste burning facility but cancelled those plans due to concerns about the pollution a second facility would emit. Instead it embarked on a plan to divert 75% of its waste by 2034, through a combination of improved policies, procedures and, technologies related to waste reduction, reuse, recycling and, composting.

Continue reading “BEA delegates to Peel Regional Council”